WE WORK FOR THE BEST.
These clubs rely on heiler.
Selection of our current projects.
Allianz Arena
FC Bayern München
During summer break 2014, the pitch at Allianz Arena was rebuilt. Within eight weeks we installed a new artificial turf edging and a new turf-bearing layer. Finally, we sowed new grass on the entire pitch.